Free MP3 Download

जमालपुर सुरंग निर्माण लेटेस्ट न्यूज - सुरंग के अंदर विद्युतीकरण कार्य शुरू Electrification In Tunnel

जमालपुर सुरंग निर्माण लेटेस्ट न्यूज - सुरंग के अंदर विद्युतीकरण कार्य शुरू
Electrification In Tunnel #1
Click image to play video, right click to save image. (Image via youtube.com)
Music Details
Titleजमालपुर सुरंग निर्माण लेटेस्ट न्यूज - सुरंग के अंदर विद्युतीकरण कार्य शुरू Electrification In Tunnel
MP3 Size3.6 MB (estimated)
Duration03:36
Views9.2K
Sourceyoutu.be/0LxHF6PhMsg
Description

The Jamalpur Tunnel was constructed in 1860-61 as part of the East Indian Railway(EIR) expansion from Howrah towards Delhi, when opened it was the EIR's first tunnel. The railway had reached Rajmahal in 1860, proceeded westward following the Ganges River reaching Bhagalpur in 1861, Jamalpurin 1862 and finally reaching Delhi in 1866.

The route required the construction of a tunnel through the Rajmahal range to cross the Jamalpur hills between Jamalpur and Ratanpur. The broad gauge(BG) railway was single track with crossing places and included the single track 275m long tunnel.

The Tunnel is among the four oldest railway tunnels in the country constructed by the British.

Owing to heavy traffic on the route, the railways have been trying to carry out Doubling on the entire section and hence the need to construct a new tunnel has arose. Also, Jamalpur Tunnel Has Already Exceeded Its Life-Expectancy, Hence, a new tunnel is an extreme necessity.

Double tracking work is over between Kiul and Bhagalpur, as well as from Pirpainti to Sahebganj. Work has started on the Pirpainti to Bhagalpur section also. But due to single track passing through the Bariakol tunnel, movement of trains on this section gets affected. Trains had to be stopped either at Ratanpur or at Jamalpur Jn to pass a train through this tunnel. So another tunnel is essential but due to delay in obtaining NOC from the forest department, this project was lying idle for the last three to four years.
Location of the second Tunnel Is some 25 metres south of the Bariakol tunnel towards the diesel shed of the Jamalpur railway workshop.

CopyrightAll materials' copyright are belong to their respective owners and/or uploader. This video was uploaded by H. Ankit
LicenseLicensed under YouTube Standard License
Download as MP3
Download as MP4
Alternative
Tagsजमालपुर सुरंग निर्माण लेटेस्ट न्यूज - सुरंग के अंदर विद्युतीकरण कार्य शुरू Electrification In Tunnel, Download जमालपुर सुरंग निर्माण लेटेस्ट न्यूज - सुरंग के अंदर विद्युतीकरण कार्य शुरू Electrification In Tunnel, Download Video जमालपुर सुरंग निर्माण लेटेस्ट न्यूज - सुरंग के अंदर विद्युतीकरण कार्य शुरू Electrification In Tunnel, Download MP3 जमालपुर सुरंग निर्माण लेटेस्ट न्यूज - सुरंग के अंदर विद्युतीकरण कार्य शुरू Electrification In Tunnel, Download जमालपुर सुरंग निर्माण लेटेस्ट न्यूज - सुरंग के अंदर विद्युतीकरण कार्य शुरू Electrification In Tunnel episode terbaru, जमालपुर सुरंग निर्माण लेटेस्ट न्यूज - सुरंग के अंदर विद्युतीकरण कार्य शुरू Electrification In Tunnel terbaru